Copy Existing Project Issue

$
0
0

Hi All,

 

We have a project in ALM that we are using for a long time. The size of the project is more than 90 GB. We would like to make a copy of the project in the same Server in the same domain. All the ALM project files are located in server D drive with sufficient space. But the C Drive has less than 60 GB.  

 

When i copy the project using the ALM "Create a project by copying data from a exisiting project", it takes days since the ALM Project size is big.  However the project files are getting copied in the Server "D Drive" but the "C Drive" gets full wih no space left and the project fails at the end.

 

When the project files are getting copied in D Drive, why is it occupying space in C Drive? 

 

Any advise, how to copy this existing project in same domain,server? 

 