Regarding Baselines:
In reference to creating a Project Report on entities in a Baseline:
In the HP ALM User’s Manual, Chapter 38 Page 994 para 3e it says:
"To create a baseline report, select ‘Select a Baseline’, and select a baseline."
However I do not see any such option at the document level settings of the project report.
How can I report on the contents of a Baseline?